Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Construction Update WIS 20: CONSTRUCTION UPDATE WIS 20-We were able to snag a traffic control crew a day early and they have been working removing equipment and preparing to reopen WIS 20. The crew should be completed with their work in the next few hours and then WIS 20 will be reopened from East Troy to Waterford!Thank you all for your patience and understanding as this was a lengthy project and a lot of work to get done!

Construction Update WIS 20-

Work on the culvert just east of Carver School Rd should be wrapped up this afternoon when we patch the road back in (see attached site photos). Once the asphalt cools enough we will open the barricades back up to local traffic. WIS 20 will remain closed to through traffic from County L to WIS 83 until next week. (see note below)

 

WIS 20 from County L to WIS 83 is scheduled to re-open later next week. The exact date isn’t known yet as the pavement markings are weather dependent and there is a little more work scheduled for Monday/Tuesday. When the date is known, I will send out an update specific to the re-opening.

 

For the section of WIS 20 in East Troy, most of the drums were picked up last night and traffic was set up for the winter configuration around the railroad tracks.

 

WIS 20 – Bell School Road to Honey Creek Rd (County Line area)

  1. This part of the project will decide when we are able to re-open WIS 20 between East Troy and Waterford. Below are the remaining operations that need to occur.
    1. Install Pavement Markings (Week of 11/11 but weather dependent)
    2. Punchlist activities

 

WIS 20 (East Troy)

Traffic:

  1. Access to Bower’s Produce can be made by continuing east on WIS 20 from County L (East Troy)
  2. Access to Green Meadows can be made by going west on WIS 20 from WIS 83 (Waterford)
  3. Access to Culver’s will be by using WIS 20.

 

This Week:

  1. Completed the concrete work
  2. Completed the guardrail asphalt spraying yesterday
  3. Picked up drums and prepared the site for winter configuration

 

WIS 20 – County L to WIS 83 (Waterford) Traffic:

  1. Access to Bower’s Produce can be made by continuing east on WIS 20 from County L (East Troy)
  2. Access to Green Meadows can be made by going west on WIS 20 from WIS 83 (Waterford)
  3. Access to Witte Landscaping can be made by going west on WIS 20 from WIS 83 (Waterford)

 

This Week:

  1. Culvert Replacement by Carver School Rd

 

Next Week:

  1. Complete pavement markings
  2. Re-Open WIS 20.

 

If you do not want to receive these updates, please let me know and I can remove you from the distribution list. Also, WisDOT has a project website set up for information that is more general than this email but could be useful if needed. https://projects.511wi.gov/20wal/