Work is now in full swing as the old concrete road is removed and the excavation work began. The project will continue the road excavation and stone placement for the foreseeable future with storm sewer work ongoing as well. Attached are some pictures of the progress from this week.
Traffic:
Access to Dollar General is available by using the median opening by McDonald’s/Shell and using the WIS 20 EB lanes to get to their driveway.
This Week:
- Finished removing the old concrete road (material is being recycled and reused in the new road way after crushing).
- Began roadway excavation followed by rock placement
- Began storm sewer installation on east end
Next Week:
- Continue storm sewer installation
- Continue roadway excavation and stone placement
Future Work (2 weeks+)
- Not much to add here yet, we will be installing storm sewer, and grading for the foreseeable future.
If you do not want to receive these updates, please let me know and I can remove you from the distribution list. Also, WisDOT has a project website set up for information that is more general than this email but could be useful if needed. https://projects.511wi.gov/20wal/